BRYAN SUBSTATION 138/69kV REPLACE AUTOS & RECONFIGURE BUSES

Projects
  • Bryan Substation
    6845 Rabbit Lane
    Bryan, TX 77808

Scope of work consisted of installation of all substation steel, GIS Bus, GIS Breakers, GIS Voltage Transformers, GIS Switches, and substation lighting for 69kV/138kV switchyards. Includes the installation and termination of all control cables and local control cabinets.  Vacuum and filling of all GIS equipment, and assist in HI-Pot testing.  Installation of station power for (2) control house, including the installation of all relay and communication panels, and miscellaneous power panels within the control houses for lighting, crane hoist power, receptacles, and lighting.  Installation of transformer blast wall, above grade grounding, and above grade conduits.  Installation of various relay panels, substation steel, substation equipment, substation bus, and control cable for (2) remote ends.  Also removal of existing substation steel, equipment, transformers, and control cables.

Initial Mobilization / Estimated Completion Date

7/1/2019 - 6/1/2020

Contract Amount:

$1,706,912.00

Job Number:

19-2202

Owner:

Entergy Corporation

General / Subcontractor

GC: Ampirical Solutions, LLC
POC: Barry Slater

Sub: Koontz Electric Co., Inc.
PM: Jeff Ludwig