BULL SHOALS UNITS 5-8 GENERATOR BREAKERS

Projects
  • Bull Shoals Powerhouse
    2737 Powerhouse Road
    Lakeview, AR 72642

Scope of Work included the design, test, and deliver new 15kV Switchgear assemblies for Units 5-8.  Removal of existing switchgear and cables, install and test new 15kV switchgear and breakers for Units 5-8,  including all new external control cables, raceways and breaker controls to interface with the existing
controls and relaying to existing powerhouse equipment to make a fully functional system.  Design and furnish new bus transition sections and modify the existing metal enclosed bus and install  the new bus transition sections to connect the new 15kV switchgear to the existing generator and transformer non-segregated phase buses for Units 5-8.

Initial Mobilization / Est Completion Date

9/1/2019 - 12/31/2020

Contract Amount:

$2,008,480.00

Job Number:

18-2066

Owner:

US Army Corps of Engineer
Little Rock District
POC: Mitchell Eggburn

General Contractor:

Koontz Electric Co., Inc.
PM: Jeff Ludwig