CAW OZARK WATER TREATMENT PLANT PHASE II

Projects
  • Central Arkansas Water
    Ozark Point WTP Improvements
    701 North Martin Street
    Little Rock, AR 72205

Scope of work consists of demolition of existing electrical for the treatment basin, service equipment, and feeders. Install two new MCCs with VFDs, along with additional electrical gear to power new treatment basin and Flash Mix Building. At the new Electrical Building, install a 1250kW Emergency Generator along with electrical gear and transformers to provide new utility and backup service to the plant. Replace Backwash Valve and Filter Valve Control Panels in the Filter Building. Renovation of electrical and PLC equipment in the Control Room. Installation of a new rooftop-mounted 60kW solar system. Replacement of light fixtures in existing buildings and addition of new site lighting.

Initial Mobilization / Estimated Completion Date

8/26/2019 - 4/15/2021

Contract Amount:

$5,637,036.00

Job Number:

19-1000

Owner:

Central Arkansas Water

General / Subcontractor

GC: Max Foote Construction Co., LLC

Sub: Koontz Electric Co., Inc.
PM: James Gammill