DENISON POWER PLANT TRANSFORMER SUPPLY

Projects
  • Denison Dam
    351 Corps Road
    Denison, TX 75020

The project included the design, manufacture, factory testing, dis-assembly, transport, offloading, re-assembly, movement into the final operating location, testing and commissioning oversight for two 53.5 MVA, 3-phase, 60Hz, 138-13.8kV, GDAF, generator step-up gas-insulated transformers.

Initial Mobilization / Est Completion Date

4/20/2020 - 9/30/2020

Contract Amount:

$8,369,963.00

Job Number:

18-2073

Owner:

US Army Corp of Engineers
Tulsa District
POC: Jacob West (COR)

General Contractor:

Koontz Electric Co., Inc.
PM: James Zimmerman