EL DORADO EHV TRANSFORMER BANK #3

Projects
  • El Dorado EHV Substation
    299 Union 320
    El Dorado, AR 71730

Scope of work consists of but not limited to the following:
1. Mobilization and inspection of the existing yard.
2. All material inventory for the project.
3. All documentation (SWMS)
4. Weekly COSS safety site visits.
5. Demo of existing equipment shown on drawings.
6. Installation of new equipment and steel shown on drawings.
7. Installation of new bus and fittings are shown on drawings.
8. Above grade conduit and grounding.
9. Transportation of 3 transformers from Mabelvale to El Dorado.
10. Offloading, setting, assembling, and testing transformers at site.
11. Replacement of breaker B5820.
12. All onsite workers to be CIP approved

Initial Mobilization / Estimated Completion Date

10/1/2019 - 2/28/2021

Contract Amount:

$3,666,77.00

Job Number:

19-2459

Owner:

Entergy of Arkansas
POC: Jonathan Kooiman

General Contractor:

Koontz Electric Co., Inc.
PM: Joey Dold
Superintendent: David Gray