The scope of work consists of repair, rehabilitation, and improvements to the bridge lift span’s mechanical and electrical systems. Includes replacement and upgrades of the bridge’s electrical infrastructure including the electrical utility service, bridge...
The scope of work consists of design, procurement, removal of the old equipment, and installation of the new equipment. Testing of (20) Motor Control Centers and (11) Panelboards. The project requires the extension of existing equipment pads and some reconfiguration...
Scope of work consists of design, manufacture, and factory test two 40,000/53,000 kVA, 161kV high-voltage winding (H)/13.2 kV delta low-voltage winding (X), cooling class ONAN/ONAF, three-phase GSU power transformers and accessories. Deliver two GSU power transformers...
The scope of work consists of the removal and disposal of three existing three-phase GSU transformers and the associated neutral current transformers and surge arresters. Removal and disposal of three existing panelboards designated 440VAC Power Cabinet, 120VAC...