BEAVER LAKE
SWITCHGEAR REPLACEMENT
774 Dam Site River Road
Eureka Springs, AR 72631

Initial Mobilization / Completion Date

5/2025 - Estimated 5/2027

Contract Amount:

$5,631,437.00

Owner:

USACE
Little Rock District

Job Number:

25-2108

General Contractor

GC: Koontz Electric Co, Inc.
PM: Stephen Andrews

SCOPE OF WORK:

Replace the 480V Station Service Switchgear.

Replace the following Distribution Centers with arc-resistant meeting IEEE C37.20.7 equipment shall be used:
1) Switchyard Distribution Center
2) Air Conditioning Distribution Center
3) Pump and Compressor Distribution Center
4) Oil Pump Distribution Center
5) Lighting Distribution Center
6) Unit 1 Distribution Centers (1P and 11P)
7) Unit 2 Distribution Centers (2P and 12P)
8) Unit 3 Distribution Centers (3P and 13P)
9) Unit 4 Distribution Centers (4P and 14P)
10) Unit 5 Distribution Centers (5P and 15P)
11) Sump Pump Motor Control Center