


The scope of work consists of the demolition of existing MV switchgear, power, and controls to 5 pumps and motors. Installation of the new MV switchgear and replacement of the main feeder cable. Installation of the new power, control, and installation for the 5 new pumps and motors. Modifications to analog signals and existing backup control panel.