CAW OZARK WATER TREATMENT PLANT PHASE II
Central Arkansas Water
Ozark Point WTP Improvements
701 North Martin Street
Little Rock, AR 72205

Initial Mobilization / Completion Date

8/26/2019 - 8/31/2021

Contract Amount:

$5,637,036.00

Owner:

Central Arkansas Water

Job Number:

19-1000

General Contractor

GC: Max Foote Construction Co., LLC

Sub: Koontz Electric Co., Inc.
PM: James Gammill

Scope of work consists of demolition of existing electrical for the treatment basin, service equipment, and feeders. Install two new MCCs with VFDs, along with additional electrical gear to power new treatment basin and Flash Mix Building. At the new Electrical Building, install a 1250kW Emergency Generator along with electrical gear and transformers to provide new utility and backup service to the plant. Replace Backwash Valve and Filter Valve Control Panels in the Filter Building. Renovation of electrical and PLC equipment in the Control Room. Installation of a new rooftop-mounted 60kW solar system. Replacement of light fixtures in existing buildings and addition of new site lighting.