CAW WILSON RENEWAL
& RESILIENCY PROJECT
338 Pleasant Valley Drive
Litte Rock, AR 72212

Initial Mobilization / Completion Date

5/19/2025 - 5/2030

Contract Amount:

$30,001,835.00

Owner:

Central AR Water
Little Rock, AR

Job Number:

25-1262

General Contractor

GC: Max Foote Const. Co, Inc.
POC: Matt Pittman

SC: Koontz Electric Co., Inc.
PM: Jeff Ludwig

 

SCOPE OF WORK:

Rehabilitation of the existing water treatment plant’s facilities, including modifications and upgrades to the Flocculation and Sedimentation Basins, Filters, and other various treatment systems.

Construction of a new Bulk Chemical Building, Backwash Treatment Tank, and Electrical Building.

Addition of a new complete fiber loop to serve the plant’s SCADA system.

Major modifications and upgrades to the PLC Control Panels.

Upgrades to the plant’s main Control Room and modifications to provide a new separate SCADA Room to house the plant’s main control panels, including moving all existing controls over from the old control panels to the new.

Various lighting upgrades to replace old fixtures with new LED fixtures across the plant.