DALLES DAM
Dalles Dam, Oregon

Initial Mobilization / Completion Date

8/1/2018 - 8/30/2019

Contract Amount:

$2,862,340.00

Owner:

US Army Corps of Engineers
Portland District
POC: Ryan Shoemaker

Job Number:

17-2058

General Contractor

Koontz Electric Co., Inc.
PM: Jeff Ludwig

Excellence in Construction Award 2020 Project

The scope of work consisted of:
* Removal and Disposal of (19) 480VAC circuit breakers.
* Removal and Disposal of (6) 12SVDC circuit breakers.
* Removal and Disposal of (2) battery disconnect switches.
* Removal and Disposal of conduit and wire connecting battery disconnect switches to the SB Board.
* Removal and Disposal of conduit and wire connecting battery system 1 and 3 to battery disconnect switches.
* Removal and Disposal of underground warehouse feeder & fiber optic cable.
* Removal & Disposal of (6) high voltage motor operators for ground switches.
* Installation of (6) control panels for the motor operated ground switches.
* Installation of DC switchboard in the battery charging room.
* Installation of (33) maintenance switches with blue indication lights, and all associated conduit and wire.
* Installation of (19) digital trip 480VAC circuit breakers.
* Installation of SkV (DP1) switchgear.
* Installation of underground warehouse feeder and fiber optic cable.
* Installation of (6) 12SVDC circuit breakers.