The project included the design, manufacture, factory testing, dis-assembly, transport, offloading, re-assembly, movement into the final operating location, testing and commissioning oversight for two 53.5 MVA, 3-phase, 60Hz, 138-13.8kV, GDAF, generator step-up gas-insulated transformers.
DENISON POWER PLANT TRANSFORMER SUPPLY
Denison Dam
351 Corps Road
Denison, TX 75020
351 Corps Road
Denison, TX 75020
Initial Mobilization / Completion Date
4/20/2020 - 2/1/2022
Contract Amount:
$8,369,963.00
Owner:
US Army Corp of Engineers
Tulsa District
POC: Jacob West (COR)
Tulsa District
POC: Jacob West (COR)
Job Number:
18-2067
General Contractor
Koontz Electric Co., Inc.
PM: James Zimmerman
PM: James Zimmerman