SCOPE OF WORK:
The scope of work consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in strict accordance with the detailed requirements of this contract:
Remove and dispose of existing station service transformer A located in Switchyard 1.
Remove and dispose of existing station service transformer B and oil.
Remove existing containment curbing and fence
Remove and dispose of existing 15kV and 5kV cables to station service transformer B.
Remove and dispose of existing conduit and power, control, and annunciation cables from transformer B to Powerhouse 2.
Remove and dispose of existing 5kV switchgear in Powerhouse 2
Remove and dispose of existing 5kV feeder cables from station service switchgear in Powerhouse 2 to the loads and to the 5kV switchgear in Powerhouse 1.
Remove and dispose of all power, control, and annunciation cables for the 5kV switchgear
i. Remove and dispose of existing 5kV switchgear meters located on the unit control board in Powerhouse 2 and instrument board in the control room.
Furnish and install oil containment and transformer pad for the Government furnished station service transformer B in switchyard 2.
Install Government furnished station service transformer B
Furnish and install new 15kV and 5kV cables, conduit and duct bank from the powerhouse to the new transformer B location in switchyard 2.
Furnish and install new power, control, and annunciation cables to the new transformer
Furnish and install new 5kV switchgear in powerhouse 2.
Furnish and install new 5kV feeder cables from the station service switchgear to the loads and to the 5kV switchgear in powerhouse 1
Furnish and install new power, control, and annunciation cables for the 5kV switchgear.
Install Government furnished Shark meters.
Test and commission equipment installed.