The scope of work consists of the replacement of (21) 480VAC and 125VDC motor control centers, (6) panelboards, 125VDC Main Switchgear, 125VDC Control Switchgear, and 125VDC CO2 System 1 Switchgear.
The scope of work consists of the replacement of (21) 480VAC and 125VDC motor control centers, (6) panelboards, 125VDC Main Switchgear, 125VDC Control Switchgear, and 125VDC CO2 System 1 Switchgear.