The project included the removal of two existing station service transformers, design and fabrication of two replacement transformers, and installation of two station service transformers and ancillary equipment at the Ice Harbor Lock and Dam. Replacement transformers were 5000/6250kVA, mineral oil-immersed transformers with On-Load Tap Changers on the secondary side. Transformer TJO was a Class I air-cooled, 15kV/4160V transformer that utilized the existing 5kV and 15kV bus duct. Transformer Two was a Class II air-cooled, 115kV/4160 that utilized the existing 5kV bus duct.
ICE HARBOR DAM TRANSFORMER REPLACEMENT
Burbank, Washington
Initial Mobilization / Completion Date
5/1/2019 - 11/30/2019
Contract Amount:
$2,889,277.00
Owner:
US Army Corps of Engineers
Walla Walla District
POC: Kate Lyon
Walla Walla District
POC: Kate Lyon
Job Number:
18-2062
General Contractor
Koontz Electric Co., Inc.
PM: James Zimmerman
PM: James Zimmerman