The scope of work included removal of four of the existing 500kV hydraulic group-operated disconnect switches and ground switches. Koontz installed four new 500kV motorized group-operated disconnect switches with electric operators, surge resistors, and motor operated grounding switches. The scope of work also included the construction and installation of new platforms, ladders, and walkways for the operator control stations and maintenance catwalks.


