KCM Projects:
CleanBreak:
Provide the electrical infrastructure to power the new CIP – COP and chemical Tot system. This scope would include Install electrical / communications scope including panels, wire basket, wire pulls and terminations
Steppenwolf:
Provide the electrical infrastructure to the power the new K6 Line. This scope would include Install electrical / communications scope including panels, wire basket, wire pulls and terminations
HVAC Replacement:
Provide the electrical infrastructure to the power 24 new rooftop AC units. This scope would include Install electrical disconnects, conduit, new wire pulls and terminations
Edge Trim and Drum Filter:
Provide the electrical infrastructure to the power the new Edge Trim and Drum Filter equipment. This scope would include Install electrical / communications scope including panels, wire basket, wire pulls and terminations
MCC MCD:
Provide the electrical infrastructure to the power the new MCC MCD. This scope would include Install electrical / communications scope including MCD electrical panels, wire basket, wire pulls and terminations