The scope of work consisted of constructing a 138-12.5kV substation including all substaiton structures, for a single bay configuration, one dead end structure, bus and switch supports. Also one 12.5kV cap bank, breaker, one cap bank, various cabinets and switches, various potential transformers, grounding grid, meggered control cables. Install all interior control house cabinets, wiring, racks, wireway and relaying.


