MATHEWSON SUBSTATION / SUBSTATION WORK
Piedmont, Oklahoma

Initial Mobilization / Completion Date

6/2/2020 - 8/21/2020

Contract Amount:

$406,542.00

Owner:

OG&E
POC: Val Smith

Job Number:

20-2252

General Contractor

Koontz Electric Co., Inc.
PM: Joey Dold
Super: Adam Clark

Scope of work consist of the installation of line terminal, buswork, control cable, switches, breakers, arresters, metering CTs, fault recorder rack and line rack.  Also includes structural physical installation, steel erection, equipment, dirtwork, foundations, and testing.  This project was completed on time and under budget.