MILLER’S FERRY POWERHOUSE
1606 Power House Drive
Camden, AL 36726

Initial Mobilization / Completion Date

7/2024 - 4/30/2025

Contract Amount:

2,177,771.00

Owner:

USACE, Mobile District
POC: John Mullins

Job Number:

23-2100

General Contractor

Koontz Electric Co. Inc.
PM: Stephen Andrews

SCOPE OF WORK:

* Remove existing 15KV switchgear for unit 1, unit 2, and unit 3.

* Install three government furnished 15KV switchgear lineups for unit 1, unit 2, and unit 3.

 * Replace all the low-voltage cables from removed equipment and install new cables to new equipment.

* Replace 15kV feeders from each switchgear lineup to the respective GSU transformers tubular bus. Remove potheads and replace connectors.

* Design and furnish new 15kV bus extension and transition sections.

* Modify the existing non-segregated metal enclosed bus and install the new bus extension and transition sections to connect the new 15KV switchgear to the existing generator bus. Design and furnish Power
Potential Transformer (PPT) tap compartment integral to bus extension.  Furnish all bus connectors and fasteners for units 1, 2, and 3 to make a complete operational system.

* Replace PPT cables and conduits.

* Coordinate with the switchgear manufacturer to Design and Fabricate, as necessary, and Install balance of the plenum system for each of the new switchgear to vent the exhaust to a safe area.
* Perform necessary commissioning, testing and training.

* Dispose of old Switchgear from unit 1, unit 2, and unit 3.