Scope of work included:
- Build out 161kV bus to include, three 69kV breakers, three new dead end structures.
- Install any motor operators and adjust.
- Install various potential transformers.
- All breaker jumper and control wiring and terminations.
- All Control House internals.
- Install all substation grid conductors.
- Install all control cables.
- Megger all outdoor control cables.
- Terminate and lip all relaying cables.
- Spreading of OG&E supplied gravel to 4 inches coverage over entire substation.
- Installing 4 OG&E supplied oil filters inside drain boxes