OMPA PLANT/PONCA GENERATING SYSTEM
Ponca, Oklahoma

Initial Mobilization / Completion Date

1/1/2018 - 7/31/2018

Contract Amount:

$1,859,756

Owner:

Oklahoma Municipal Power Association (OMPA)

Job Number:

17-2057

General Contractor

Koontz Electric Company, Inc.
Project Manager: James Gammill

The scope of work consisted of installing a new 69/12.5kV substation with an owner furnished GSU transformer and 69kV SF6 circuit breaker.  KECI also installed a new transmission line to connect the plant to the existing utility lines and new control and medium voltage cables to the new equipment located in the substation. KECI was responsible for the removal of existing switchgear within the plant, and installing a new owner furnished 15kV and 480V Switchgear and MCC.  KECI was also responsible for the controls interface between the new equipment and Control Room via hard wired as well as Modbus TCP/IP.