The scope of work included, providing temporary power to serve all essential AC and DC loads on panels that are being replaced. The panels to be replaced may contain lead base paint and asbestos wiring.
The work included design, construction and incidentals related for new Recorder Board Panels 7R, and 8R with new breakers to separate the Essential AC breakers and DC breakers, new Station Board Panels 7F and 8F, new Motor Generator Distribution Center, along with the new instrumentation devices, and incidental related work. Replaced the existing battery chargers with new redundant chargers. Demolition of existing recorder board panels 7R and 8R, with breakers, existing station board panels 7F and 8F, with instrumentation devices, existing Motor Generator Distribution Center, and existing battery chargers. Demolition included abatement of asbestos containing materials such as panel wiring and panels with lead base paint.