PINTAIL 345KV SUBSTATION
Garber, Oklahoma 

Initial Mobilization / Completion Date

5/27/2020 - 11/20/2020

Contract Amount:

$2,446,321.00

Owner:

OG&E
POC: Val Smith

Job Number:

20-2251

General Contractor

Koontz Electric Co., Inc.
PM: Joey Dold
Super: Ben Noll

Scope of work consisted of building a new 345kV yard to include, but not limited to 345kV switches, 345kV breakers, all steel support structures, and fabricate all aluminum bus and install.  Also included all below and above grade grounding, all above grade conduit, pull and terminate all associated control cable, build out the inside of the control house, build and install the relay panels and all testing and commissioning.