REPLACE SWING BRIDGE
Des Allemands, Louisiana

Initial Mobilization / Completion Date

8/17/2015 - 2/1/2016

Contract Amount:

$1,920,514.00

Owner:

Burlington Northern Santa Fe Railway

Job Number:

14-1243

General Contractor

GC: OCCI, Inc.
PM: Doug Kolb

Sub: Koontz Electric Co., Inc.
PM: Jamie Zimmerman

Subcontract with OCCI Construction. The scope of work consisted of the installation of new electrical system for swing span bridge. This included installation of new grounding and lightning protection system, submarine cable, emergency generator and transfer switch, control panels, PLCs, and limit switches, pier lights, and furnishing of motors and brakes.