SPLENDORA SUBSTATION TRANSFORMER REPLACEMENT & INSTALL FIREWALL
Splendora, Texas

Initial Mobilization / Completion Date

1/1/2020 - 10/13/2020

Contract Amount:

$1,824,836.00

Owner:

Entergy Texas, LLC
POC: Cody Collins

Job Number:

19-2509

General Contractor

Koontz Electric Co., Inc.
PM: Joey Dold
Super: Marshal Bryant

Scope of work consisted of relocating gate, replace 138/13.8kV transformer T1, replace transformer T1 low side feeder and feeder bay with main breaker, three feeder breakers and bus tie switch.  Replace transformer T2 low side feeder breakers and feeder bays.  Replace with one main breaker and two feeder breakers.  Demo all existing breakers,  breaker foundations, bus foundations, existing switches and still associated the low side of transformer T1 and T2.  Install firewall, cable trench, run conduit from new equipment to cable trench and to control house.  Relocate gates, extend grounding gird and install drainage.