Scope of work consisted of Foundation, Electrical and Relay work. Replaced transformer T2, installed 69kV circuit switcher, installed firewall, installed oil containment around transformer T2 and transformer T1, replaced low side MOS switch, replaced high side switch with a set of 69kV PTs and removed old PTs and high fuses. Also included replacing high side switch with a set of 69kV PT’s and removed old PT’s and high side fuses.