Aug 21, 2025
SCOPE OF WORK: Removal of existing medium voltage gear. Installation of new medium voltage gear & DC Battery Systems.
Aug 14, 2025
SCOPE OF WORK: The scope of work consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in strict accordance with the detailed requirements of this contract: Remove and dispose of existing...
Jul 24, 2025
https://koontzelectric.com/wp-content/uploads/2025/07/Untitled-design-3.mp4 SCOPE OF WORK: Install New 345KV Substation New control house Complete and support all interconnect & outage activities Line Terminal Installation Bus work Installation Control...
Jul 24, 2025
https://koontzelectric.com/wp-content/uploads/2025/07/Iowa-Southland-Mid-America.mp4 ...
Jul 22, 2025
SCOPE OF WORK: * Remove existing 15KV switchgear for unit 1, unit 2, and unit 3. * Install three government furnished 15KV switchgear lineups for unit 1, unit 2, and unit 3. * Replace all the low-voltage cables from removed equipment and install new cables to new...