Greenfield 345KV Switchyard connecting windmill farm generating a total nameplate capacity of 151.8 MW. The scope of work consisted of 345kV switches, 345kV breakers, steel support structures, and fabricated bus work. The main bus line is rated for 11000A and is...
Scope of work consists of demolition of existing electrical for the treatment basin, service equipment, and feeders. Install two new MCCs with VFDs, along with additional electrical gear to power new treatment basin and Flash Mix Building. At the new Electrical...
The scope of work consists of replacing the existing 5kV switchgear and dry-type transformer. This includes cabling, generator transformers, benchboard modifications including new metering, control switches and internal wiring, and new protective relaying for...
The project included the design, manufacture, factory testing, dis-assembly, transport, offloading, re-assembly, movement into the final operating location, testing and commissioning oversight for two 53.5 MVA, 3-phase, 60Hz, 138-13.8kV, GDAF, generator step-up...
The work performed under this contract consisted of providing the labor, equipment, and materials to remove the existing single-phase GSU transformers, the 15 kV switchgear for units 1 and 2, the iso-phase bus between the generator and transformers, connections to the...