Aug 21, 2025
SCOPE OF WORK: Replace wiring to the Control Room via the S-boards for seven (7) existing 15kV 3-phase synchronizing potential transformer cubicles. Replace existing 230kV tubular aluminum bus segments for all phases, phase A, phase B, and phase C, at...
Aug 15, 2025
SCOPE OF WORK: Replace the 480V Station Service Switchgear. Replace the following Distribution Centers with arc-resistant meeting IEEE C37.20.7 equipment shall be used: 1) Switchyard Distribution Center 2) Air Conditioning Distribution Center 3) Pump and Compressor...
Aug 14, 2025
Scope of Work This section covers the technical specifications to perform, all work required to install government furnished 13.8kV generator switchgear, 480V station service switchgear and two station service transformers, as well as modification of units 1, 2, and 3...
Jul 22, 2025
https://koontzelectric.com/wp-content/uploads/2025/07/Grand-Prarie-24-2093.mp4 SCOPE OF WORK: – Mobilization & Demobilization -Electrical – Div #26 and emergency lights -Electronic Safety and Security Div. #28 -Fiber Optic...
Jul 22, 2025
SCOPE OF WORK: * Remove existing 15KV switchgear for unit 1, unit 2, and unit 3. * Install three government furnished 15KV switchgear lineups for unit 1, unit 2, and unit 3. * Replace all the low-voltage cables from removed equipment and install new cables to new...