SCOPE OF WORK: The existing 15kV switchgear located in the cubicle room at elevation 2071 will be replaced with a new 15kV switchgear lineup that will include the generator and tie breakers located in the cubicle room, and new 15kV outdoor circuit breakers located in...
Aug 21, 2025
SCOPE OF WORK: Replace wiring to the Control Room via the S-boards for seven (7) existing 15kV 3-phase synchronizing potential transformer cubicles. Replace existing 230kV tubular aluminum bus segments for all phases, phase A, phase B, and phase C, at...
Aug 15, 2025
SCOPE OF WORK: Replace the 480V Station Service Switchgear. Replace the following Distribution Centers with arc-resistant meeting IEEE C37.20.7 equipment shall be used: 1) Switchyard Distribution Center 2) Air Conditioning Distribution Center 3) Pump and Compressor...
Aug 14, 2025
SCOPE OF WORK: The scope of work consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in strict accordance with the detailed requirements of this contract: Remove and dispose of existing...
Aug 14, 2025
Scope of Work This section covers the technical specifications to perform, all work required to install government furnished 13.8kV generator switchgear, 480V station service switchgear and two station service transformers, as well as modification of units 1, 2, and 3...