Aug 15, 2025
SCOPE OF WORK: Replace the 480V Station Service Switchgear. Replace the following Distribution Centers with arc-resistant meeting IEEE C37.20.7 equipment shall be used: 1) Switchyard Distribution Center 2) Air Conditioning Distribution Center 3) Pump and Compressor...
Aug 14, 2025
SCOPE OF WORK: The scope of work consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in strict accordance with the detailed requirements of this contract: Remove and dispose of existing...
Jul 24, 2025
https://koontzelectric.com/wp-content/uploads/2025/07/Untitled-design-3.mp4 SCOPE OF WORK: Install New 345KV Substation New control house Complete and support all interconnect & outage activities Line Terminal Installation Bus work Installation Control...
Jul 24, 2025
https://koontzelectric.com/wp-content/uploads/2025/07/Iowa-Southland-Mid-America.mp4 ...
Mar 1, 2023
Scope of Work: Design, manufacture, and factory test two 40,000/53,000 kVA, 161kV high-voltage winding (H)/13.2 kV delta low-voltage winding (X), cooling class ONAN/ONAF, three-phase GSU power transformers and accessories. Deliver two GSU power transformers and...