Mar 12, 2026
SCOPE OF WORK: The existing 15kV switchgear located in the cubicle room at elevation 2071 will be replaced with a new 15kV switchgear lineup that will include the generator and tie breakers located in the cubicle room, and new 15kV outdoor circuit breakers located in...
Aug 22, 2025
SCOPE OF WORK: Project Overview Green Bay Packaging (GBP) is undertaking a major modernization project at its Arkansas Kraft paper mill in Morrilton, Arkansas. This multi-year upgrade includes infrastructure improvements such as a new recovery boiler, biomass boiler,...
Aug 21, 2025
SCOPE OF WORK: Replace wiring to the Control Room via the S-boards for seven (7) existing 15kV 3-phase synchronizing potential transformer cubicles. Replace existing 230kV tubular aluminum bus segments for all phases, phase A, phase B, and phase C, at...
Aug 15, 2025
Scope of Work: Installation of electrical equipment furnished by others including, but not limited to, unit substations, switchgear, UPS, panels, transformers, PDUs and transfer switches as shown on Electrical One-Line Diagrams S26-302 thru S26-306. Installation of...
Aug 15, 2025
SCOPE OF WORK: Replace the 480V Station Service Switchgear. Replace the following Distribution Centers with arc-resistant meeting IEEE C37.20.7 equipment shall be used: 1) Switchyard Distribution Center 2) Air Conditioning Distribution Center 3) Pump and Compressor...